Close Menu
    What's Hot

    Heat intensifies severe drought across European nations

    July 24, 2026

    Amazon wildfires in Brazil fall to lowest level in four decades

    July 23, 2026

    Private sector wage growth hits six year low in latest UK data

    July 22, 2026
    Facebook X (Twitter) Instagram
    Liberia SunLiberia Sun
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    Liberia SunLiberia Sun
    Home » Rashid Rover to explore Atlas Crater on the Moon on April 25th
    Technology

    Rashid Rover to explore Atlas Crater on the Moon on April 25th

    April 12, 2023
    Facebook Twitter Pinterest Reddit Telegram LinkedIn Tumblr VKontakte WhatsApp Email

    The Mohammed Bin Rashid Space Centre (MBRSC) of the United Arab Emirates has announced that the Rashid Rover is set to land on the Moon on April 25th, 2023, at 8:40 PM (UAE time). The rover is currently onboard the HAKUTO-R Mission 1 Lunar Lander, which is orbiting the Moon at an altitude of about 100 km at perilune and about 2,300 km at apolune. The actual landing date is subject to change, depending on operational conditions.

    Rashid Rover to explore Atlas Crater on the Moon on April 25th

    On the day of the landing, the lander carrying the Rashid Rover will perform multiple orbital control maneuvers to reach a 100 km circular orbit around the Moon before initiating the landing sequence. The lander will perform a braking burn, firing its main propulsion system to decelerate from orbit. Using a series of pre-set commands, the lander will adjust its altitude and reduce velocity to make a soft landing on the confirmed site of Atlas Crater in the Mare Frigoris. The ELM team will complete close to a total of 370 minutes of communication with the world’s most compact rover before landing, along with 12 mission rehearsals for surface operations.

    The UAE’s Emirates Lunar Mission, which is funded by the ICT Fund of the Telecommunications and Digital Government Regulatory Authority (TDRA), is aimed at supporting research and development in the ICT sector in the UAE. The HAKUTO-R Mission 1 lunar lander that holds the Rashid Rover will complete all planned lunar orbital control manoeuvres before the landing sequence, as well as confirm that the lander is ready to start the landing sequence. Three alternative landing sites have also been scheduled in case of any changes in operational conditions, with the next landing opportunities set for April 26th, May 1st, and May 3rd.

    Named after the late Sheikh Rashid bin Saeed Al Maktoum, the Rashid Rover will conduct surface exploration and collect data to enhance the understanding of the Moon’s geology and its evolutionary history. Equipped with a high-resolution camera, a mass spectrometer, and a laser-induced breakdown spectroscope, among other instruments, the rover will gather data on the Moon’s mineralogical composition and surface characteristics. The mission is part of the UAE’s efforts to contribute to the global space industry and establish its position as a leader in the sector.

    Share. Facebook Twitter Pinterest LinkedIn Reddit Email

    Related Posts

    UN urges fair rules for artificial intelligence worldwide

    July 18, 2026

    Australia AI office faces calls for artist representation

    July 16, 2026

    Samsung sets 2029 start for first Yongin semiconductor plant

    July 13, 2026

    China unveils AI protein synthesis platform in Shanghai

    July 11, 2026
    Latest News

    Heat intensifies severe drought across European nations

    July 24, 2026

    Amazon wildfires in Brazil fall to lowest level in four decades

    July 23, 2026

    Private sector wage growth hits six year low in latest UK data

    July 22, 2026

    UN urges fair rules for artificial intelligence worldwide

    July 18, 2026
    © 2026 Liberia Sun | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.